Installation Kronowall 3D
Installation guide and video guide for Kronowall 3D from KronoOriginal®
Assembly instructions - Kronowall 3D (PDF)
Installation guide

Step 2
Leave cartons of laminate flooring in the same climatic conditions (15 - 30°C, 40 - 70% humidity) as the room they are going to be installed in for at least 48 hours.

Step 3
Create a laying plan to reduce waste.

Step 4
Install the sub-construction / lathing.

Step 4a
Sub-construction living room

Step 4a2
Counter-battens construction in bathrooms.

Step 4b
Ensure ventilation!

Schritt 4b
Ships must be backlit.

Step 5
1. Insert panels longitudinally, secure with nails or claws.

Step 6a
Mount other panels.

Step 6b
Mount optionally with zero-joint (A) or cm-joint (B).

Step 7
Panels with profile claw CL 3.6 K (tip: User nailing help or...

Step 8
...secure it with staples.

Step 9

Step 10a
Mark last panel...

Step10b
...and cut out.

Step 10c
Fit in.

Step11
Mount skirting board.